Wood Log Steam Boiler Expanded Polystyrene Production Line
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
0106 Transmission Line Clearing and/or Maintenance—Tree Trimming Along Existing Lines & Drivers (Texas) 4459 Plastic Mfg.—Expanded Polystyrene Pellets (Texas) 4459 Plastic Scrap Recycling—Grinding, Shredding, Etc. (Texas) 5183 Steam Pipe or Boiler Insulating & Drivers (National) 5183 Thermostat Installation—Pneumatic & Drivers Get Price
Dec 01, 2016 · If the total gas production is 5,300 ft 3 /day (150m 3 /d) and the heating need is 1,600 ft 3 /day (45m 3 /d), the necessary gas storage will be 3,500 ft3 (100m 3) if cooling water from an internal combustion engine driving an electric generator provides the heat for the digester, and 2,000 ft 3 (55 m 3) if a separate heating boiler is used Get Price
Dec 01, 2016 · If the total gas production is 5,300 ft 3 /day (150m 3 /d) and the heating need is 1,600 ft 3 /day (45m 3 /d), the necessary gas storage will be 3,500 ft3 (100m 3) if cooling water from an internal combustion engine driving an electric generator provides the heat for the digester, and 2,000 ft 3 (55 m 3) if a separate heating boiler is used Get Price
Dec 01, 2016 · If the total gas production is 5,300 ft 3 /day (150m 3 /d) and the heating need is 1,600 ft 3 /day (45m 3 /d), the necessary gas storage will be 3,500 ft3 (100m 3) if cooling water from an internal combustion engine driving an electric generator provides the heat for the digester, and 2,000 ft 3 (55 m 3) if a separate heating boiler is used Get Price
0106 Transmission Line Clearing and/or Maintenance—Tree Trimming Along Existing Lines & Drivers (Texas) 4459 Plastic Mfg.—Expanded Polystyrene Pellets (Texas) 4459 Plastic Scrap Recycling—Grinding, Shredding, Etc. (Texas) 5183 Steam Pipe or Boiler Insulating & Drivers (National) 5183 Thermostat Installation—Pneumatic & Drivers Get Price
0106 Transmission Line Clearing and/or Maintenance—Tree Trimming Along Existing Lines & Drivers (Texas) 4459 Plastic Mfg.—Expanded Polystyrene Pellets (Texas) 4459 Plastic Scrap Recycling—Grinding, Shredding, Etc. (Texas) 5183 Steam Pipe or Boiler Insulating & Drivers (National) 5183 Thermostat Installation—Pneumatic & Drivers Get Price